City of Pharr Wastewater Treatment Plant Improvements

Demolition of an entire existing wastewater treatment train & construction of new treatment train to include new BNR Basins, two new secondary clarifiers, a new filter structure, ultraviolet disinfection structure, gravity belt thickener building, sludge dewatering and belt press building, and operations/control building. Also included the addition of two 1250 KW generators and associated electrical improvements via change order.